Cutting-edge energy rails installation at Watchland, Geneva.
At Amperio, we are committed to delivering advanced and tailored electrotechnical solutions to our clients. Our team had the honor of collaborating with Franck Muller on a prestigious project: installing energy rails at their headquarters and production site, Watchland, in Geneva. This unique site integrates all stages of watchmaking, from design to engraving, including assembly and case manufacturing.
Project background
Watchland is a unique site where watchmaking tradition meets innovation. To maintain the high level of excellence required by Franck Muller, a reliable and efficient power supply is essential. In this context, Amperio was brought in to install a custom energy rail system tailored to the varied and demanding needs of Watchland.
Technical details of the installation
The project involved setting up 900 meters of energy rails with different capacities to meet the diverse needs of the various stages of the watchmaking process:
Total Length: 900 meters
Rail Capacities: 2000A, 400A, and 250A, allowing for flexible and appropriate distribution for each phase of the production process.
Protection Rating (IP): IP55, ensuring protection against dust and water splashes, which is crucial in a high-precision production environment.
The installation of the energy rails at Watchland was carried out in several key stages:
Planning and Design: Assessing the specific needs of each department at Watchland to design a custom energy rail system.
Installation: Laying the rails to minimize disruptions to ongoing operations, with particular attention to safety and efficiency.
Testing and Validation: Thoroughly checking the proper functioning of the energy rails to ensure stable and reliable power supply.
Commissioning: Activating the system and monitoring to ensure seamless integration with existing infrastructure.
Advantages of energy rails
This installation enables Watchland to optimize its production processes by ensuring a reliable and secure power supply. The different capacities of the energy rails allow for tailored solutions to the specific needs of each stage of the watchmaking process, from design to engraving.
The energy rail installation project for Watchland in Geneva is a testament to Amperio’s ability to deliver tailored and high-performance electrotechnical solutions. We are proud of this achievement and the positive impact it has on Franck Muller’s operations.